Information
Details
More Info
Transcription
g* 20 23 26 Commencing at a connection with existing 3‘* cast iron water main in Sweeney Avenue at 10th Street, thence westerly in Sweeney Avenue with an 3" cast iron water main to 9th Street, a distance of approximately 255 feet, thence southerly in 9th Street with a 6n cast iron water main in Oakey Boulevard, a distance of approximately and 730 feet, Commencing at a connection with the 6W cast iron water main to be constructed in 9th Street, as hereinabove provided at Griffith Avenue, thence with a 6” cast iron water main westerly in Griffith Avenue to the center line of 3th Street a distance of approximately 435 feet, and Commencing at a connection with the 6” cast iron water main to be constructed in said 9th Street at Bracken Avenue as hereinabove provided, thence with a 6” cast iron water main westerly in Bracken Avenue to the center line of 3th Street a distance of approximately 475 feet, and Commencing at a connection with the 3“ cast iron water main to be constructed in said Sweeney Avenue at said 9th Street as hereinabove provided, thence with a 6" cast iron water main westerly in said Sweeney Avenue a distance of approximately 330 feet, thence southerely at right angles, a distance of approximately 305* to a connection with the 6” cast iron water main to be constructed in Bracken Avenue as hereinabove provided, Approximately 40 lineal feet of six inch (6tt) cast iron fire hydrant connections to serve four fire hydrants in location designated by City Authorities The cost of constructing said water mains(exclusive of the cost of said fire hydrant connections) is the agreed sum of #9,990.00, the expense of which shall be borne by the Owner. 2. Said water main shall be constructed of 3" and 6” cast iron pipe and shall be in accordance with AWWA specifications, All joints shall be cement and all pipe shall be new B. & S. cast iron, equal to AWWA Glass 150. All fittings shall be new, all - 2 - A-//*
