Search the Special Collections and Archives Portal

man000165 140

Information

Digital ID
man000165-140
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 La- 19 20 21 22 23 24 25 26 mandj if said actual cost be less than f>638.00, then the Company will pay to the Subdivider the difference between said estimated cost so advanced and the actual cost. By actual cost is meant the cost of all material and sup­plies delivered to the job, the cost of all labor employed in con­nection with the installation of said water main, the cost of premium on contractor’s surety bond, Public Liability, Property Damage and Contractor’s Contractual Liabilityr^nsurance, plus ten percent (10%) for supervision and overh" e**a d £ * ? -lVi.S 3, This agreement shall in; urfee It"o the benefit of and be binding upon the heirs, executors, administrators, successors and assigns of the respective parties hereto. IM WITNESS WHEREOF, the, parties hereto have executed this agreement as of the day and year first above Witten’. Attest: ,$$GAS LAND AND-"WATER COJIPANy By.h i Vice President L. T. GARRETT I