Information
Details
More Info
Transcription
AGREEMENT ARTICLE I. SUBDIVIDER AGREES: 1. At its sole cost and expense to furnish all necessary materials and labor for the construction of, and to construct, approximately 470 LF of 6” cast iron water main in location described as follows: Commencing at a connection with existing 6n cast iron water main in Eastern Avenue approximately 210 feet southerly of center line of Charleston Boulevard, thence easterly parallel with the southerly line of Charleston Boulevard, a distance of approximately 470 feet. The cost of constructing said water main is the agreed sum of #1,610.00. 2. Said water mains shall be constructed of 6n Class 150 B & S cast iron pipe and shall be in accordance with Federal specifications WWP Type 1. All joints shall be cement. All fittings shall be new, all bell cast iron equal to ASA Standard Class 250. All valves shall be double disk, parallel seat bronze mountings conforming to AWWA standards, not less than 175 lbs., and all valve boxo shall be of cast iron of appropriate size for each valve. Unless otherwise approved by a duly authorized representative of the company, all pipe valves and fittings shall be manufactured by the Pacific States Cast Iron Pipe Company or Mueller Company. All pipe lines shall be chlorinated in accordance with AWWA specifications, shall be subject to the approval and acceptance of State and City Health Authorities, and shall be constructed at an elevation to be designated by a duly authorized representative of the Company, but -2-
