Information
Details
More Info
Transcription
J. M. MONTGOMERY & CO., INC. Engineers Los Angeles 35, Calif, LOS ANGELES AND SALT LAKE RAILROAD CO Valuation of Collection and Transmission Facilities (as of Dec. 31, 1950) ITEM Quantity Aver. Estimated ________________Reproduction Cost______________ Depreciation Age Total Life Per Unit Overhead Total Total Present _________________________________ (Years) (Years) Installed % Amount Per Unit Amount Annual Accrued Value TRANSITE PIPE Size 24" Class 100 Lin. Ft. 854- 3.5 70 11.73 5 24" 50 977 13.5 70 10.48 5 20" 100 3,376 6.5 70 8.56 5 18" 100 691 6.5 70 7.17 5 18" 100 166 3.5 70 7.17 5 16" 50 3,607 13.5 70 5.28 5 14* 100 219 3.5 70 4.73 5 H * - S.H. 976 1.5 70 4.73 5 12" 100 944 3.5 70 3.63 5 12" 100 1,524 0.5 70 3.63 5 12" 50 1,280 13.5 7Q 3.27 5 12" 50 174 8.5 70 3.27 5 59 12.32 10,521. 150.30 526. 9,995. 52 11.00 10,747. 153.53 2,073. 8,674. 43 8.99 30,350. 433.57 2,818. 27,532. 36 7.53 5,203. 74.33 483. 4,720. 36 7.53 1,250. 17.86 63. 1,187. ,26 5.54 19,983. 285.47 3,854. 16,129. 24 4.97 1,088. 15.55 54. 1,034. ,24 4.97 4,851. \ 69.30 • 0 |H 4,747. ,18 3.81 3,597. 51.38 180. 3,417. ,18 3.81 5,806. 82.95 41. 5,765. ,16 3.43 4,390. 62.72 847. 3,543. ,16 3.43 597. 8.53 72. 525. $ 98,383. $ 11,115. $ 87,268. 10
