Information
Details
More Info
Transcription
3 TABLE B WATER PRODUCTION FACILITIES Los Angeles & Salt Lake Railroad Company Fixed Capital Investment Cost SUMMARY TOTAL Estimated 12/31/48 12/31/49 12/31/50 Land $ 34,986 $ 34,986 $ 34,986 Improvements 738,165 765,397 775,400 Total $'773,151 $800,385 $810,586 Investment Cost - Per Books Item As of 12/31/49 Land (1230.74 acres) Pipe - $ 34,985.88 Transite, all sizes 78,562.71 Reinforced concrete, 12” 1,083.96 Vitrified clay, 6 ” 426.34 Welded steel, 24" 4,622.07 Wrought iron, 2" 250.00 8 ”, 1 0 " and 1 2 " 1,535.01 Cast iron, 4" . , m u /jA 3,192.11 597.71 8 " and 1 0 " 7,361.20 12" and 14" 18,093.54 16" 24,094.00 241* 226,389.25 36" 3,331.98 Wells - 2 - 12", drilled 13,406.30 9 - 16" " 99,511.26 Derricks and weir boxes 6,076.18 Reservoirs, 1 - 1,200,000 gal. 97,571.47 1 - 2,500,000 gal. 47,534.25 Settling basins, concrete 21,673.71 Buildings - concrete 15,204.33 frame 4,439.81 Manholes & valve boxes, concrete 5,078.05 Fencing 6,089.04 Tank, wood on concrete foundation 510.65 Primping equipment 46,393.37 Miscellaneous Power Lines - Poles I,800.78 * 4,614.74 Wire & equipment 25,952.79 Total $800,382.49
