Information
Details
More Info
Transcription
WATER PRODUCTION FACILITIES TABLE D LOS ANGELES & SALT LAKE RAILROAD COMPANY Fixed Capital Original Cost and Present-Day Cost SUMMARY TOTAL Estimated 0£i£3£alCost- Land 2/ 12/31/48 12/31/49 12/31/50 # 75,900 # 75,900 # 75,900 Improvements 738,165 779,254 789,300 Total # 814,065 # 855,154 # 865,200 Present-Day Cost Land # 75,900 $ 75,900 # 75,900 Improvements 1,061,800 1,120,900 1^.30,900 Total #1,137,700 #1,196,800 #1,206,800 December 51, 1949 Original Present Item Cost Day Cost Transite pipe, all sizes # 79,886 | 123,844 Welded steel pipe, 24" 5,743^ 8,471 Reinf. concr. pipe, 12" 1,084 2,742 W. I. pipe 2” 250 335 8", 1 0 " & 1 2 " 1,535 2,246 Cast iron pipe 4" 3,192 4,502 6 " 598 863 8" 1,728 2,603 1 0 " 5,633 8,328 1 2 " 18,078 24,359 14" 15 22 16" 35,507 58,725 24" 226,389 322,036 36" 3,332 5,204 Vitrified clay pipe 6 " 426 572 Wells, drilled 2 - 12" 13,406 19,680 9 - 16" 99,512 129,198 Derrick & weir boxes 6,076 10,912 Reservoirs 1 - 2,500,000 gal. 47,534) 205,748 1 - 1 ,200,000 gal. 97,572)' Settling basins 21,674 Buildings - concrete 33,335 15,204 18,742 frame 4,440 8,297 Manholes & valve boxes 5,078 9,320 Fencing 6,089 8,994 Tank, wood on concr. found. 511 894 Pumping equipment 46,393 57,840 Miscellaneous 1,801 2,437 Power Line - Poles 4,615 6,544 Wire 25,953 44,107 Total Land #779,254 } 75,900 pi, 120,900 ,s 75,900^-H^ v Total, incl. Land #855,154 #1,196,800 1/ With land at present-day cost. 2/ Includes 679.42 acres of production land and also pipe line and pole line rights of wav. 0
