Information
Details
More Info
Transcription
5 WATER PRODUCTION FACILITIES #AblE D los a n 'geles""& s a l t , l a w rai lroa d-c o m p a n y Fixed Capital Original Cost and Present-Day Cost SUMMARY TOTAL Estimated y Original Cost 12/31/48 12/31/49 12/31/50 Land 2/ $ 75,900 $ 75,900 $ 75,900 Improvements 738,165 779,254 789,300 Present-Day Cost 814,065 855,154 865,200 Land 75,900 75,900 75,900 Improvements 1,061,800 1,120,900 1,130,900 $1,137,700 $1,196,800 $L, 206,800 December 31, 1949 Original Present Item Cost Day Cost Transite pipe, all sizes $ 79,886 $ 123,844 Welded steel pipe, 24” 5,743 8,471 Reinf. concr. pipe, 12? 1,084 2,742 W. I. pipe 2? 250 335 8 ", 1 0 ” & 1 2 ” 1,535 2,246 Cast iron pipe 4” 3,192 4,502 6 ” 598 863 8 ” 1,728 2,603 1 0 ” 5,633 8,328 1 2 ” 18,078 24,359 14” 15 22 16” 35,507 58,725 24? 226,389 322,036 36? 3,332 5,204 Vitrified clay pipe 6 ? 426 572 Wells, drilled 2 - 12? 13,406 19,680 9 - 16? 99,512 129,198 Derrick & weir boxes 6,076 10,912 Reservoirs 1 - 2,500,000 gal. 47,534) 205,748 1 - 1 ,200,000 gal. 97,572) Settling basins 21,674 33,335 Buildings - concrete 15,204 18,742 frame 4,440 8,297 Manholes & valve boxes 5,078 9,320 Fencing 6,089 8,994 Tank, wood on concr. found. 511 894 Pumping equipment 46,393 57,840 Miscellaneous 1,801 2.43 V «/' Power Line - Poles 4,615 6,544 - J P Wire 25,953 55,107 ^ Total $7797251 $1,120,900 /(y Land 75,900 75,900<y Total, incl. Land 1/ With land at present-day cost. $855,151 $1,196,800 2/ Includes 679.42 acres of production land and and pole line rights of way. also pipe line
