Search the Special Collections and Archives Portal

man000174 82

Information

Digital ID
man000174-082
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    % Well 12. 3 - f>0 KVA transformers to H.P. motor. furnish power for one 125 Well 13. 3 - 5 0 KVA transformers to H.P. motor. furnish power for one 125 SWITCHES. CIRCUIT BREAKERS, ETC.: Contractor to furnish and install all necessary switches and/or circuit breakers required by National Electrical Code. POWER LINE TO WELL SITE: Contractor shall construct power line to well site and connect to pumping plant panel. Wire shall be of adequate size to carry maximum current demand. -1+-