Information
Details
More Info
Transcription
sMFC July 2 3, 1951. CAPITAL AUDITIONS FOR 1951 (ept.l**+.**) From Page 10 of Exhibit »B" in the Rate Case: Production Company $ 69,250 Water Utility # 230,000 The details for the Production Company are' given in Table X, Bxh. "B*. vizi Pipe line to connect Wesleigh Tract $ 2,110, Pumping station and- pipe line to serve West Side District 40,340. Install pumps in Wells 8, 10 and 11 18,800* Install automatic electric starting and timing controls at booster stations and wells 4,000 Install telemeter equipment and circuits to record water level in reservoirs and pressures in L.V.L. & W. CO. water mains 4.000 total | 69,250 The details for the Land and Water Company- 1951 estimates: A, Improvements for reinf. of mains to increase capacity and pressure Construct main, vicinity of A and Jackson ats. Construct main, North Main St. West Side Trans. Line various locations 3600 ft, 3" and 6H, $ 13,150 640 ft 6* 2,300 4280 ft. 12« to 8» 25,200 5500 ft. 8" and 6” 25.000 * 65,650 B. Subdivisions- Under construction Westleigh Tract, W. Charleston Blvd Ream Tract, Bracken Ave. Southridge » , Between loth and 11th Love Tract, E. Charleston Blvd Ridgeview Tract, Columbia Tract, E. Charleston & Eastern C. Known Proposed Additions Westleigh Tract, W. Charleston Blvd Mountain View , , Charleston Blvd. Southridge Tr. , Between 10th and 11th L.¥. Pub. Housing Proj,, Washington & H, Econosgr Tract, 1. Charleston Blvd. Columbia Tract, E. Charleston & Eastern D. Anticipated further Subdivision Development Various locations Grand total 3060 ft. 8« and 6M # 13,000 330 ft. 6« 1,000 2480 ft. 8W and 6" 10,000 990 ft 8» and 6» 3,000 1500 ft. 8“ and 6* 5,500 1950 ft. 6* - 7,300 $ 39,800 9000 ft. 6" 1 35,000 5000 ft. QBand 6" 27,500 4500 ft. 8" and 6* 18,000 2300 ft 8* and 6" 10,000 3000 ft 6" 11,000 9800 ft 8" and 6n - 4o;ooo $ 141,500 55,000 $ 230,000 NOTE* Items A, B, C, and D are covered by advance deposits. (HFC) > v
