Information
Details
More Info
Transcription
ij&s Vegas Valley Water District Differences Between Aixsouats Compiled on Schedule A and Montgomery Report for the Period From January 1, 1951 to September 1, 1952 MPoangteg Noome0 royf Report Detalle -- 4 Mo and Lo for installation of two pressure*>redueing valves near 21st and Stewart 4 4 5 9 9 6 6 6 7 7 8 8 Tn«+.*n connection in Stewart near Bruce to serve area south of Steuart (addition to W/0 640) Construct additional B” main required by City in St* Louis Avenue W/0 678 - 8" CIP » « 6" CIP Total W/0 678 Per Montgomery Report TpgfcaTi, Punp and Motor on Wells Bs 10 & 11 300,000 galo tank etc0 - Schedule A«4 $136,622*00 Per Montgomery Report 127.600.00 W/0 674 - 6" CIP $ 88*26 ? - 8" CIP 6,050o31 It -10" CIP 12,536*56 « -12" CIP 7,467*60 ? -14" CIP Total w/0 674 r s M Per Montgomery Report 600*52 W/0 684 - 6" CIP $ 2,448o65 Per Montgomery Report W/0 685 - 6" CIP $ 3,760*78 " « 8" CIP F^7S8*88 PerT Mootnatlg Wo/me0r 6y8 R5eport 62*04 W/0 696 - Included in Montgomery Report, this W/0 completed after 9/1/52 and included in additions to basic purchase price at 6/30/54 Construct Mains « Columbia Hgts* - Canceled Construct Mains — Columbia Hgts0 — Canceled W/0* 653 -=» 68"" CCIIPP PerT Mootnatlg Wo/m0e r6y5 R3e port Amount 2,302*67 238o64 732o39 (5,994o31) 2,625o45 (9,022o00) (26,246o99) (980o38) (5,706o84) 9,694o82 6,320o00 6,460o00 (1,213o60) Total Differences * ( 20,790*15)
