Information
Digital ID
upr000037-149
Permalink
OPSRATIKO GOST DATA August, 1944, the cost of electrical energy for pumping was approximately #7*29 per million gallons. Average total coat of water at pol$* of use for the first seven months of if## was as follows$ Goat of Water Purchased Supply and Transmission Storage and Treatment Distribution # 1,688 per million gallons 10,200 « • 8 17.0% ? ? * 3.129 * * * Sub-total # 32.062 8 8 8 Evaporation & Operating Waste 0.434 11 Total # 32.496 8 • N DOTH Depreciation and replacement not included. 8
