Information
Digital ID
upr000050-110
Permalink
Confirming owe phone conversation this after-* noon, regarding the isae of Caahmn’s ditcher for s t r a i t ening out th© laa ftg&a Oreaki I shoe? below a detailed estimate of coat of tasking a ®ow ditch bet/sen the Middle Spring and present bridge at Main Street; ; H - -'<PH H days ? itoohine rental .# $10*00 per day $120*00 I days labor @ 12.00 per d a y 72.00 6 days feel, oil k tools 10.00 per day 60.00 7 toys hand labor, turning creek into new'ditch and closing''off old ditch, ® $20*00 per day 140.00 Bstimted tot-.! . . « • • * • ^ 392.00 fhis estimate was compiled here in the office,• and is, of course, merely an estimate. Our figures are -based .on the Sartors Green ditcher excavating at an average depth of 3 feet, width 20 inches, and trenching approximately 1700 lineal feet per day. Above does not Include expense of engineers setting grade stakes or supervision expense* Tours truly.
