Information
Details
More Info
Transcription
\ m EZTRAOKDTKARY OPERATING EXPEHSE —mnWLd¥mias usianoiHTjtf 1 "Tf LAS VEGAS. HBVALA TABLE HO. 1 / w.o. Late Description Amount ------lOJTfor "d8n© Year 2932 3747 1920 1922 Connecting new pipe lines Excavate and backfill; also conns ot and install new pipe line # 61.61 1438.53 Total - Jdmary 1. 1925 - - - 11500.15 $15 0.01 ’£¥67 1925 5589 1925 0-50 4-24-25 Temporary settling "basin and control of flood waters Replacing pipe lines and renewing roof and fan at Springs Renew 200* of 16” wood stave pipe Total - January 1. 1926 - - - $ 3774.08 9287.68 4 810.00 |15371.90 $1537.19 6871 12-31-26 Cut roof for ventilators on Spring Hons© | 3.08 Total - Jamary 1, 1927 - - 115374.98 $1537.50 0-109 0-149 7393 192 7 192 7 11-30-27 Renew in kind 3750' of 16” wood stave pipe Repair water facilities Clean out spring and remove concrete wall Total - January 1. 1928 $10250.00 358.00 49.44 $26032.42 $2603.24 0-208 1920 Repair water facilities Total - January 1, 1929 i 233.00 26265.42 $2626.54 8248 8577 (Hot Corap It .) Reservoir and settling basin(Est) 2300.00 23” pipe line 2220.00 $3078.54 Total - Jamary 1, 1930 $30785.42 f BOTS:- Extraordinary Op orating Expense spread over 10 £ear period Los Angeles, Calif. May 27, 1929.
