Information
Details
More Info
Transcription
HH AROELES i SALT LAKE RAILROAD CQ&PANY fj» 1 Fixed Capital ICoat of Production water Sagffi BOWOKf TOTAL 12/51/48 Estimated la/si/so lapreveaieist# Water Right* fetal # 54,986 # 54,986 # 54,986 738,164 765,597 775,400 50.000 50.000 50.000 • -gqsfrsg-----8gg>7SgBS----"rotm Classification Investment Cost Bar Books MM Of 18/51/49 Land (1950.74 acres) Pips - Tran*it*, all else* Reinforced concrete, Ur Vitrified clay, 6* welded steel, 84s wrought iron, 8* i«, 10* and 12* east iron, 4* 6* 8* and 10* 12* and 14* 16* 24* Cftfl walla - 2 - 18*, drilled 9 - 16* * Derricks and Weir Boxes . Reservoirs, 1- t/^-oOi000 1* * 1 *» ^Soo, Ob<» wl. settling basins, concrete ^ Buildings - concrete frame Manholes & valve boxes, concrete Foscing. Tank, wood on concrete foundation Pumping equipment Miscellaneous Power lines - Poles Wire & Equipssnt # 34,988.88 78.562.71 1,085.96 426*34 4,682.07 250.00 1,335.01 5,192.11 597,71 7,561.20 18,093.54 24,094,00 226,389.25 3,551.98 13,406.50 99,511.26 6,076.18 97,871.47 47,534.25 21.673.71 15,204.33 4,439.81 6,078.05 6,089.04 510.65 46,393.37 1,800.78 4,614.74 25.952,79 Total #800,382.49
