Information
Details
More Info
Transcription
Form 30-1 (Last Sheet) C. S. 6-30-100,000----U WORK ORDER AUTHORITY—Detail of Estimated Expenditures f_OF___JJsHEETS LAS VEGAS LAND A gagi Bearing .DEPARTMENT .DIVISION October 11 * .19. LOCATION: DESCRIPTION Laa Vegas, Nevada Relay approximately 2588s Of 4" wood a teve water p . with 4" and e* 6 .X .pipe line and lay 50s of 1" and 405° of/ noN: 3/4« a#x,pipe eervice lines in fardle Addition; relay 253^ nd and C.I.pipe line trenew (i 1 5???^ xnxS \ General Manager’s 241 revaluation Section of 4“ and 6" wood stave pipe line with 4" aad 6" Cl. pip# linetrenew ' [ Department 54® of 1* and 278° of 3/4" G.Icpipe service lines and install 2 additional « boar in Hawkins Addition. Install 114° of 4" C.Xo pipe line, eto> for La3 y< No.- No.- R.and E.' ACCT. No. ? DESCRIPTION Hawkins Additlen BAishiiag0 lay pipe and has kf ill Losating pipe linos,truek+ ing and supervision 1" galv •wrot steel pip# velvet and fittings-rene 3/4” galv owrot steel pipe valves and fittings-rsns Arbitrary percentages QUANTITY ired ired UNIT Left AC CPUS 3 i ECOLLEC IBLS-LA^I m Bitching* lay pipe and backfill lid Locating pipe lines„truck ing and supervision 4” presaulksd 0X150 ClP 114 4M C.Iofittings A Special! 3N galv ? wrot eteel pipe and fiitings Lead aud oakum Arbitrary pereentages Notes- At the tine water lines la Ob Addition were acquired tie woodes liner were considered worthless add would require replacement 9 therefo the outire coat ef replacement is chargeable to Investment Ac countv Loft TOTAL UNIT COST pipe d re n 0.55 0o5$ 0.52 LABOR MATERIAL OR TRANSPORTATION CHARGES 580 63 4 >8 7 10 TOTAL CHARGEABLE TO INVESTMENT ACCOUNT 4 40T 4 730 Total Estimated Expenditure Estimate By_ Date— .19- Approved. - - $_ -Approved- 8 125 OPERATING EXPENSES 1 831 City of Las Vegas 290 n 3ior *W h e n labor or m a terial is chargeable to both Investment A ccount and Operating Expenses show items separately.
