Information
Details
More Info
Transcription
1 2 5 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Section 5. After the sale date, the following work shall be performed: (a) The construction of a 39-inch reinforced concrete or concrete cylinder pipe line in location shown by broken red and white line between points marked A and V and V and K on said Exhibit "A” connecting with existing 24-inch cast iron pipe line and 16- inch transite pipe line at point marked A. (b) The construction of a 24-inch cast iron or concrete lined and coated steel pipe line in location shown in broken red and white lines between points marked K and E on Exhibit "A" connecting at point K with the pipe line referred to in subparagraph (a) of this section and at point E with existing 24-ineh cast iron pipe line. (c) The construction of an 8-inch east iron pipe line in location shown by broken red and white lines between points marked Y and D on Exhibit "A" connecting at point Y with the pipe line referred to in subparagraph (a) of this Section 5 and at point D with existing 8-inch cast iron pipe line. (d) The relocation of the pumping station now located at point HH to a new location shown in solid green square on Exhibit "A" near point R. (e) Construction of a 14-inch cast iron or concrete lined and coated steel pipe line in location shown by red line between points marked S, T and U on Exhibit "A" and extending to a connection with existing 12-inch cast iron pipe line near point marked S and to a connection with existing 12-inch cast iron pipe line in 24
