Information
Details
More Info
Transcription
2 relocated to point R. Pumping station will not be constructed at location R. X understand that easement granted District under,. Sec. I paragraph (1) page 8 has been re-conveyed to RR Co.<o/pb (e) Construct lkn pipe line between S, T and U: pipe, valve and meter on RR Co. property near point LL. Mr.Renshaw advised that this will be removed at an early date. (i) Remove pipe line between II and JT:- Pipe line removed. (j) Remove power line IT to HH:- Power lines removed. (k) Remove power, telephone and telemeter line CC to GG-:- Power line, telephone and telemeter lines removed. (l) Remove pipe lines A to E, A to E and R to H.H.j- (l)Pipe line A to K was removed except 60 ft. of pipe under pavement in Highway 95 which Engineer for District advises was left in place at request of Highway Commission. I recommend that no exception be taken to leaving this pipe under pavement in place. However, it might be well to secure the Highway Commission’s approval. In addition to the above District removed that portion of this line from point K to angle point in line just westerly of RR Co. tracks except that portion under shop road was not removed. I recommend portion under road be left in Pipe line constructed per District plans as approved by RR Co. (f) Construct 6" pipe line between I and 00:- Constructed by LVL&W Co. prior to sale date. (g) Construct power lines between D and Y and Y and V:- Powef lines constructed by District at locations not on (h) Remove pipe line between EE and LL: Pipe line removed except approximately 30 ft. of pipe
