Information
Details
More Info
Transcription
.8. Distribution Mains; Mr* Toland* #3 January 30, 1941 SRMMiMMsMMeM* 34*» In us© first of rear is# CI 1,966* 32,914* (R#) 16,464* 6" (Cl) 16,244* (RW) 23,000* 8" (Cl) 0,823* ( m ) 10* 12* (Cl) 1,134* i y %> *( Adjustment of 68* to clear In place.) In use at end of J0BSL ((wCil)) 341,,082786**<(yP ,w) 10,892*'/ (Cl) 19,354*r(]W) 18,858^ (Cl) 16,636*/ <R*> Rone*, (Cl) 1,134* 5 ? 7 «ro (Cl) 736* ?n-yfrUt ' t rjyf j ('£ there Is no 6** R/w no# Note* The above figures were arrived at by using as basic figures the information shown under Item 8 on our 1939 Report, and adding (or subtracting) the important changes during the year as follows* S work Order 393 - reb-ft.or. 1940> Installed* 'Z4868* of 8* C.I. Pipe 4/ 604* of 6* C.I* Pipe / 712* of 4* C.I. Pipe $5B4T Installed. (360* work order 407 - Rov.-Pec.1940* Retired* / £760* of 8" R/W Pipe / 3002* of 6n R/w Pipe / 718* of 4* R/w Pipe O T P * Retired of cross lateral on Rrldger abandoned) Installed* Retired* / 730* of 12" C.I. Flpe/ /3870* of 6* C.I. Pipe/ < 2656'of 8" C.I. Pipe/ / 402* of 4" C.I. Pipe / TBBSF installed. (Includes 450* Pioneer 81k 7 and 716* on Charles ten of new m i n s . ) 26* of 8* C.I. Pipe / V 544* of 8* R/W 7lpe • / 50* of 6" C.I. Plpe> '1140* of 6» n h PIP® / /480O* of 4" R/# Pipe / j 80* of 3" #.!*• Pipe K Retired. 9. Reaervolre* On®, enclosed cement construction, with wooden top* Capacity - 2,600,000 gallons. 10. Purification system* Settling basin, capacity 5,000,000 gallons per day.
