Information
Details
More Info
Transcription
Lae Vegae • March §, 1943 W 23-1-22 Sir. Frank strong* Supplementing ay letter February 20th and referring to our own ©oarereation regarding installation of water mains in fourth unit of Huntridge Tract. I attach hereto a list showing the nuaber of houees that will be constructed in each biook; a division of footage of M/L pipe between transmission aain installed to the tract and within the tract; and an estimate of eerriee line footage, some change was aade in the latter beoause of elimination of the main originally designed for Maryland Parkway. Please, therefore make changes in the first, second, fourth and last items of estimate attached to Mr. Oakey'e letter, February 2nd as follows* Labor* 8400 Ft. Main Line 3240 Ft. Sra. Lines Material 4670 Ft. of 6* C.I. Pipe 3240 Ft. of 3/4 Oe.lv, Pipe % .90 Ft. 17680.00 b .60 Ft. 1620.00 is .82 14204.40 % .0829 268.60 Please, therefore make request for work order authority on the basis of 8,400 feet M/L pipe, 168 houses and #22,602.87. We have conferred with Mr. oakey and his Engineer, Elsenman today regarding the necessity for these changes in order to ©oafor® to the rule,to which they agree, I m asking Mr. Meitonae with copy of this letter to proceed with drawing the contract. ----- m m r w r m m m c© - Mr. w. H. Guild Mr. C, K. Bennett Mr. Leo A. Mehamee
