Information
Details
More Info
Transcription
Mr, L, A. White - Omaha Las Vegas - May 7, 1952 W 9-1-3 Following.is a list of materials used and purchased during the month of April 1952, to he credited and charged to M, 0, H. accounts. Charge M D H 30-2 11 7 ea. 6rt split sleeve ea. 3/4" H-15^70 45° copper bends 4 ea, 1” H-15^70 45° copper bends 1 ea. Repair clamp for if-" pipe 8 ea. valve bonnets 2 ea. valve cover lids 8 ea. 12H"top sections for boxes 33 ©&. 3/4” H-15475 90° copper bends 1 ea. 1“ H-15475 90° copper bends 9 ea. 1" H-15475 90° copper bends 59 ea, 3/4* H-15425 couplings 7 ea. I* H-15425 couplings I ea. Ij-M H-15425 couplings 360000 ft. 3/4 8 type K copper tubing ft, 3/4* type K copper tubing 66 ft, type K copper tubing (l8) II ft. l-g-8 type K copper tubing 43 ea. H-10000 3/4" coj?p stop 4 ea. H-10C3 1N corp. stop 51 ea. B-10257 3/4* curb stop 6 ea. H-10257 1* curb stops 4 ea. valve boxes Charge ¥0 674 1 ea. 108 C I plug Charge MOH - Credit WO-674 1000 ft. 88 C I pipe 118.04 9 1*009 17.15 9 1.7542 7.02 6.75 0 4.197 33.58 0@ 2.196 4.39 6.361 50.89 0 1.127 37.19 0 1,88 1.88 9 1.744 16.00 0 .6373 37.60 0 1.009 7.06 0 3.47 3.4? 0 .3905 117.15 © .32466 194.80 9 ,40278 26.58 0 .65283 7.18 0 1.6954 72.90 0 2.401 9.60 © 1.8816 95.96 © 2.8909 17.35 ©25.34 101.36 *p- 00 0 2.3477 |2 347.67 W. H. Johnson
