Las Vegas - August 15* 1952 I f , L. V, Pe&rt - Omaha oc! Mr. R. L. Adamson Follow ing Is closeou t data, V/0 6?4 covering construction o f water transmission lin e to serve West Sid© D is t r ic t , Las Vegas, Nevada. D escription o f work performed, which was commenced September 4, 1951 and completed July 7» 1952 is as follow s? Constructed 72 LF o f 14* 1321 LF o f 12* 2605 LF o f 10* and 1341 LF o f 8" cast iron water lin e and 25 LF o f 6* oast iron f i r e hydrant connections. D e ta il o f charges is attached togeth er w ith s ta tement o f adjustments, To complete accounting, there should be added the cost o f 36 LF o f 12* oast iro n pip© furnished by Water S ervice Department a t Las Vegas as covered by Shipping N otice No. 5, dated February 6, 1952 which had been ordered f o r WO 4?89 on R equ isition 64-12*3-, dated May 17, 1951. With the in c lu s iv e o f the above charges WO 6?4 w i l l be fin a n c ia lly complete. Data fo r d epreciate p u ro s e s is as fo llo w s : 14” oast iron pipe lin e 72 LF I 704.98 12* oast iro n pipe lin e 1321 LF 7^67.60 10* cast iro n pipe lin e 2605 §|§ 12536.56 8* oast iro n pip© lin e 1341 LF 6050.11 6* Cast iron pipe lin e 25 LF . 88. 2o T ota l #26847.51 To the cost o f the 12“ pipe lin e should be added the cost o f the 36 LF o f 12* cast iron pipe furnished by the R ailroad Company above r e fe r r e d to . Attached to Mr, Adamson*s copy is p rin t showing lo c a tio n o f pipe lin e constructed fo r use in preparing 8AC“ P rin ts * W. H. Johnson