Information
Details
More Info
Transcription
Las Vegas - March 9* 1953 W-9-1-3 Mr. L.V. Peart - Omaha Following Is a list of materials used and purchased during the month of February, 1953 to be credited and charged to M.O.H. aocounts: CHARGE M.O.H. ¥-123 Reliable Iron Foundry $33*16 #35*42 Draft 643 - Frt Charges 2.26 Details 4 ea 4* 01 Solid Sleeves @ $8,855 ©a 35.42/ CHARGE M.D.H. 30-2 CREDIT M.O.H. 1 ea 4“ Cl Solid Sleeve • 8.855 ©a 8.855 2 ea 6* Cl Split Sleeve @ 16.90 ea 33*80 109 ea 3/4* B-15475 90° Bends ® 1.0682 ea 116.43 1 ea li" H-15475 90° Bend @ 4.607 ea 4.607 116 ea 3/4* B-15425 Copper to Iron • .637 ea 73*89 12 ea 1" H-15425 Copper to Iron 9 .9996 ea 12.00 1 ea 1|« B-15425 Copper to Iron €*2.85 2.85 2200 ft 3/4* Type K Copper Tubing 9. .32934 ft. 724.55 150 ft 1* Type X Copper Tubing © .47295 ft. 70.94 7 ft l£* Type K Copper Tubing 9 .83855 ft. 5*87 113 ea 3/4* B-10003 Corp. Stops @1.5974 ea. 180.51 3 ea 1* H-1QQ03 Corp. Stops @ 2.401 ea. ?.20 1 ea l£* B-10003 Corp. Stops 9 7*37 1 ea 2* 1-10003 Corp. Stops 12.29 100 ea 3/4* B-10257 Curb Stops @ l.?836 178,36 7 ea 1* B-10257 Curb Stops 9 2.891 20.24
