Information
Details
More Info
Transcription
Form 30*1 (First of intermediate Sheet) 7-51-50M SHEET 2 OF 5 SHFETS W O RK O R D ER A U TH O R ITY—Detail of Estimated Expenditures LOS ANGELES & SALT LAKE RAILROAD COMPANY ENGINEERING______ department California_______ division_____ March 24 ^,53 location: Las Vegas, Nevada - Main Line description: Drilling l6"water well 800 ft. deep and in stalling 520 GPM electrically operated pumping equipment, etc. President's, State_____________ Valuation Section Department No.___5 2 9 4 ?Nev ada---- No— I Q ------ No________________ R. and E . A C C T . No. DESCRIPTION QUANTITY UNIT UNIT COST LABOR M A T E R I A L O R TRANSPORTATION C H A R G E S 20 Pier Excav. NG 120 CY 3.00 360 Arbitrary percentages 330 920 Booster pump 520. * GPM Pump, 20 HP Ntr. & ftgs. 1 ea 800.00 800 Pump panel controls 150 Elec, wiring 50 50 Expansion tank^ 150 Cone, base for pump&tank 20 15 Install pump, etc. 250 Arbritrary percentage s 30 215 Pipe lines Excav backfill NG 452 CY 3.00 1356 10" Cl pipe Class 15C 312 LF 3.50 1 092 8" Cl Pipe Class 15C I960 LF 2.76 5 410 8" Standard WS Pipe 170 LF 2.66 452 6" Cl Pipe Class 150 144 LF 1.92 276 4” Cl Pipe Class 150 352 LF 1.29 454 2” Galv. I Pipe 380 LF 0.49 136 ' 1^" Galv.pipe I 325 LF 0.37 120 ln Galv. I Pipe 25 LF 0.23 6 10"xlO"xlO"Hub End Tee 2 Ea 53.32 117 I0"xl0"x8" " " " 1 EA 56.70 57 8"x 8wx§" " « r 4 EA 41.40 166 8"x 6"x6" " " r 1 Ea 40.02 40 6"x 6»x6" " M 1 2 Ea 30.60 61 6”x 6"x4" " n T 1 Ea 26i46 26 6"x 6"x2f» n " T 1 Ea 25.20 25 6Mx 6"xl5M " " * 1 Ea 23.00 23 4”x l”x4n Topped tee 1 Ea 19.30 20 10” Hub end gate valT e 3 Ea 222.87 669 10" Flanged gate valT e 1 Ea 222.87 223 S" Hub end gate val% e 8 Ea 131.62 1 053 8" Flanged gate val-\ e 3 Ea 140.00 420 8" Check valve 1 Ea 128.06 128 6" Check valve 1 Ea 74.00 74 6" Hub end gate val-\ e 5 Ea 75.10 376 4" Hub end gate val-v e 2 Ea 43.60 37 TOTAL CHARGEABLE TO I N V E S T M E N T O P E R A T IN G A C C O U N T E X P E N S E S 66 460 1 730
