Information
Details
More Info
Transcription
Mr. E. E. Calvin, V ice-Presiden t, Omaha, Nebraska. Dear S ir : May 4, 1925. 9215-355 Herewith APE Request No. 60 fo r an appropr ia tio n o f |10,700 to cover construction o f concrete s e t t lin g basin, in s ta lla tio n o f pipe lin e s , f i l t e r in water so ften er and fen cin g around w e ll and s e t t lin g basin, as contemplated by 1925 Budget Item No. 98. The in s ta lla tio n o f 1816* o f 24* wood stave pipe is proposed in lie u o f using 16" wood stave pipe as p rovided fo r under APE Request No. 228, approved September 18, 1923, which was not in s ta lle d owing to the d e s ir a b ilit y o f having a la r g e r pipe at the upper end to reduce losses in pressure due to f r i c t i o n . I t is recommended that work contemplated under present au th ority, APE Request No. 228, be m odified to include only new w e ll and fence around Big Spring, rep la cin g b u ild in gs, 300* o f 8" and 2400' o f V.C. pipe from springs, also concrete forebay, which w i l l enable c lo sin g out o f former Work Order and to complete the work as herein contemplated. As suggested in la s t paragraph o f your l e t t e r dated March 13th, containing comments o f the President in r e f erence to various budget items, plan o f the proposed improver
