Information
Details
More Info
Transcription
COST ESTIMATE Union P a cific Railroad Company 2 Water Wells - Las Vegas, Nevada . 800’ Water Well - Las Vegas 10-3/4** Water String - 7” Liner MUD; 30 Tons Rotary Mud, FOB car 20 Sacks Aquagel $ 330.00 40.00 BITS: 1 -1 /2 Used Wright 20* P ilo t 1 -1 /2 Used Hughes 15-1/8" Tricone 1 -Hughes Tricone 9-3/4" ' ?! ? „ -y Y ? CASING: 40* -16", 3/16" Plate E lectric Weld at 1.86 6’ -2 1 -1 /2 ", 3/16" Plate E lectric Weld at 1.86 ® 55O* -1 0 -3/ 4" , 40.5#, H-G .or Lap weld at 1.53 / ; 327* -7 ", 20# H-G or Lapweld at 1.20 76.44 128.00 114.00 74.40 15.94 8 a * 50 392.40 CASING PERFORATING: ; ? 307’ -7 ", 20# Casing, 2" Slots at 80$ & 'VO 60 Mesh, 14 Rows, per foot CEMENT AND CEMENTERS: 1 - Cement Job 400 - Sacks Cement at 60$ 225.0 0 *-" 240.00 FOUNDATION: CHRISTMAS TREE FITTINGS: 1 - IO-3/ 4" Close Nipple 1 - 10-3/4" Flange ^ ( 1 - 10-3/4* Flanged Cross \ 1 - 10-3/4" Bull Plug, D rilled fo r Gauge 2 - 100# ffierco Plug Cocks Flanged J S W k . MISCELLANEOUS: 1 -10-3/4" Float Shoe . ) / 1 -7 " to 10-3/4" Adapter 9 f0 ) y 1 -Set IO-3/ 4" Casing Clamps ) 3.00 5 .43 105.07 14.10 201.68 I CONTRACTOR’ S CREW AND RIG TIM—E—: \ CONTRACTOR’ S MOVING, RIGGING-UP AND j UNRIGGING (1 /2 Total Cost)__________ 10$ Contingency 1370.00 313. a 1324.24 245.60 465.00 225.00 329.28 250.00 3500.00 - 2000. 0 0 , 19027.56 902.75