Information
Details
More Info
Transcription
COST ESTIMATE V - Union Pacific Railroad Company 2 Water Well® - Las Vegas, Nevada 1» SO.©;* Water Well - Las Vegas 10-3/4* Water String - 7" Liner MUD; 30 Tons Rotary Mud, FOB car 20 Sacks Aquagel SETS; 1 -1/2 Used Wright 20" Pilot 1 -1/2 Used Hughes 1 15-1/8" Tricone -Hughes Tricon© 9-3/4-* CASING; 40* -16*, 3/16" Plate Electric Weld at 1.86 6* -21-1/2", 3/16" Plate Electric Weld at 1.86 550* -10-3/4", 40.5#, E-G or Lapweld at 1.53 327* -7", 20# E-G or Lapweld at 1.20 CASING PERFORATING; 307* -7", 20# Casing, 60 Mesh, 14 Rows, 6* Centers, 2" Slots e.t 804 per foot CEMENT AND CMENTSRS: 1 - Cement Job 400 - Sacks Cement at 60$ FOUNDATION; CHRISTMAS TREE FITTINGS; 1 - 10-3/4* Close Nipple 1 - 10-3/4* Flange 1 - 10-3/4* Flanged Cross 1 - 10-3/4" Bull Plug, Drilled for Gauge 2 - 100# Merco Plug Cocks Flahged MISCELLANEOUS; 1 -10-3/4* Float Shoe ) 1 -7* to 10-3/4" Adapter ) 1 -Set 10-3/4* Casing Clamps ) CONTRACTOR*S CREW AND RIG TIME: CONTRACTOR’S MOVING, RIGGING-UP AND UNRIGGING (1/2 Total Cost)_______ | 330.00 40.00 i 370.00 76.44 128.00 114.00 313.44 74.40 15.94 841.50 392.40 1324.24 245.60 225.00 240.00 465.00 225.00 3.00 5.43 105.07 14.10 201.63 329.28 250.00 3500.00 2000.00 19027.56 10$ Contingency 902.75 $9930.31
