Search the Special Collections and Archives Portal

upr000212 28

Information

Digital ID
upr000212-028
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    _<N l§ E s t i m a t e d Coat o f Drilling 2 Walls and c o n s t r u c t i n g appurtenances, based o n b i d f r o m Roacoe Moss Company Labor Material R. & E. 0* E. Drill 2 wells, approx. 500» deep, including furnishing and Installing all easing, etc* Contract Roscoe Moss Co* # | 9,700 $ Cement * furnished by RRCo* 300 $10,000 Construct pipe line connections from wells to collecting lines 500 1,050 1,550 install pumps and motors and construct pump houses, 450 4,650 6,100 Construct concrete mat around well and fence, 150 250 400 Construct power line, includ­ing transformers, ete* 1,215 4,280 5,495 Install telemeter end con­struct circuit, 100 500 600 Replace 954* of 24* redwood stave pipe with welded steel pipe, 2,550 2,700 2,700 2,350 Current price adJusfcment-valve- of parts replaced, 8,700 2,700 Contingencies, 476 2,350 2,306 500 Totals, $5,240 $25,760 $25,450 $5,550 Total Estimated Expenditure, M z 000