IJSJUkl The two motor* on attached shipping notice * • da* tad June 20.9 19*15, vara ordered ss reqn* datad January H , 1 9 ^ 1 f*Oi M ? t 202f| 1st connection with the installation at two Gallon Reservoir at Lae Vegas, Wav* Later, it developed that it i u naeeseax? to liulaU 75 life aetor* Us place of the 50 aoton and on roqn. #6*wioo, datad Aogttit % 19*^1 we ardarad - 2, 75 M i e n idiot vara received, installed and placed in operation first not of April, 19t5# sate on motors is as follows s 2 ~ 75 Hfe *79 awt, 280/440 fait, 60 Qyaie General Klee trio sioova Bearing natar. The seat of the 75 ***** notors was charged to Operating booster pumps in the new hap House, adjacent to the 34/2 Million Expertise. IU L» Adamson * 6/25/45