Information
More Info
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 1 3 1 4 1 5 1 6 1 7 1 8 1 9 20 21 22 2 3 2 4 2 5 2 6 work during the eourse of construction to see that said work i» constructed In accordance with the said plana and specifications Said representative shall he given access to all work areas, work in. construction* materials and equipment which are necessary for said construction. it is new estimated that the coat to the first Parties of the work provided for In this section, including supervision by First Far ties, is I „ .............. -.» Said contract shall provide for the performance of the following; work by the said contractor for First Partiesj (a) fbo construction of a 39-inch secrete or east iron pipe line in location shown by broken red- and white line between points marked A and V and V and I on said Exhibit RAW connecting with existing 2b-tneh cast iron pipe line and sb-tnofe steel pipe line at point marked A. (h) $ho eonstmction of a 2b-imeii cast iron pipe line in location shown in broken red and white lines between points marked E and 1 on inhibit “A” connecting at point K with the pipe line referred to in. subparagraph (a) of this section and at point g with existing 2b~ineh cast iron plpo lino. |e| fhe e onetruetion of an 8-inch oast iron pipe line in location shewn by broken rod end white linos bstwoon points smirked t and D on Exhibit «A* connecting at point Y with the pipe line referred
