Information
More Info
Transcription
'OSi?;. No. Date Page I6l97-3a 10-1^-53 Water Levels and Pressure Switches Revised to Provide 60 psi at &onanz,a Village Pump House. 16197-U Ij.-17-1+8 Profile of Water Line Serving Bonanza Village. 16197-5 1|.—17 —1+8 Plan of Pipe Liue Serving Bonanza Village 16197-6 1+—30—1+8 Tank Details for Pressure Tanks. 7-27-51 Diagram of Reservoir Capacities at Las Vegas. Drawings for 300,000 gal.elevated steel water tank, Chicago Bridge and Iron Company drawings numbered as follows: Design Sheets Nos. 2, 20, 21 Polio No. 2S5, 2S11, 9P137, 9P138-X, 9P150, 9P159, 9S6, 0-153, 0-177, 0-191, 0-208 Stress diagram dated 8-ll(.-52, Sheet S Stress Diagram dated 8-llj-52 Sheet SI Foundation Plan dated 1-6-53, Dwg, P General Plan dated 8-22-52, Sheet 1 30n Dia. Top Column Section dated 8-25-52, Sheet 5 Index Nos. 1P21+, 9C1+9, 9D23, 9Ml|2-B, 9M55, Allj.-l|Bg, A-25-8S1, A30-1R1, A30-2R1, A30-3.1 Rl-X, A30-i|Rl, A30-6-R-2-X, A30-7R2-X. 3-18-13 Gravity Water Supply. 3-18-15 Present and proposed Intake to Pipelines at Spring. 3-18-16 12-1921 Profile and Location of 16" C.I.P. 3-18-17 Aug. 1923 Pipe Line LV Springs to Las Vegas 3-18-18 5-1 —1+1+ Topog. Map showing location of Wells and Water Lines. 1-67 Pour cloth tracings and one paper tracing showing water lines City of Las Vegas. 1-7*1 Cloth tracing showing facilities in water field Las Vegas. H-223 9—2—i+7 Water Distribution System Las Vegas. 1-112 Bonanza Village Subdivision.
