Search the Special Collections and Archives Portal

upr000264 28

Information

Digital ID
upr000264-028
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    m LAS VEGAS LAND AND WATER COMPART Los Angeles - November 30, 1949 1-7334 Mr. L. A. White (CC Mr. W. C. Perkins, Mr. A. tt, Felger, Mr. Chas. Adams, } Referring to your Kailgram S-674, dated November 22, in connection with drilling of Well at Las Vegas authorised under WQ-598. We have reviewed the charges and oredits as detailed on Forms 4907, and they appeared to be correct with the fol­lowing exceptions: November 1948 Vo 8098 Crane Co. 1 12x12x12® #529 C.I.Flgd.Tee F.A D. f 60.13 1 12" #555 C.I.Std. Blind Flange 11.69 1 12" #461 Gate Val. P.4 D. Flg&.W-l Comp. Figs. Bolts & Gasketa Bolted on 2 12x19 #553 C.I. Figs. F.& D. 2 12" Std. Granite Ring Gaskets 24 3/8 x 3-3/4" Maoh. Bolts W/Hsx Nuts should be credited 1286.30 and corresponding charges mads to MOH. Closeout report for LVL&WCo. Work Orders 598 and 598-1 - Drill one 12" water well and install 20 H.P. sub­mersible pump on Las Vegas Ranch Property, Las Vegas, Nevada, Constructed by contraot one water well 1128 ft. deep using 1128 ft. of 16-inch No. 6 gauge double water well casing, and 65 ft. 5 in. of 20- inch No. 8 gauge conductor pipe cemented In place. Work commenced November 24, 1948. Work completed April 19, 1949. 1 at Less 2% 207.27 5.58 1273.51 12.79 $286.30 TE 1 Freight charges from Los Angeles,Calif. As the above materials were not used the Work Order is as follows: W. R X S I 2 i ' ! 3