Information
Details
More Info
Transcription
INTAKE STRUCTURES ON LAKE MEAD - SOUTH SHORE TABLE NO. 15 TO B E CONSTRUCTED IN GREELEY A N D HANSEN E S T I M A T E I ^ b 195*5 TOTAL “ I ¥ 5 5 1 1 5 1 . ---- TOTAL---- Cantilever Structure 25©1 long $ 3*10,000 $ 3**o,oo© $ 3**0»G00 $ 3**o,ooo Pumping Equipment - **-300 H.P. Units 1© MOD 136* TDH ® $17,530.00 Valves, checks, etc., lnol. installation Valves, piping, etc., on structure 7©,©00 19.000 25.000 70.000 19.000 25.000 39.000 25.000 39.000 25.000 Intake Pipe Line 1900 ft. - 5**-« x 5/16» steel line ® $5©.©© ft. 95,000 95,000 92,000 92,000 Controls, etc. 25,000 25,00© 25,000 25,000 ECnognitinnegeernicnige s- Plans - Inspection, etc. - 57^,000 86,000 50,000 57**,000 36.000 50.000 - 571,000 33.000 50.000 571,000 33.000 50.000 TOTAL TABLE 15 - $ 710,000 $ 710,000 - $ 709,000 $ 709,000 ESTIMATED COST OP CONSTRUCTION - EXCLUDING POWER TRANSMISSION LINES AND STATION EQUIPMENT $3,1*U,000 $**-,001,000 $7,1*1-2,000 POWER TRANSMISSION LINES AND STATION EQUIPMENT i**3 ,ooo 223,000 371,000 • TOTAL ESTIMATED COST OP PROJECT $3 ,2S9 ,®0© $**-,22**-,000 $7,513,000 $3,122,000 $**-,239,000 $7,*m,ooo (*) NOTE: This east evidently included In G-reeley a n d H a n s e n ' s estimate of eost of Boos t e r Stations. I
