Search the Special Collections and Archives Portal

upr000279 194

Information

Digital ID
upr000279-194
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    V ?a Prior to April, 1948, Mr. Jopling states we had a meter in the old power house which he did not think was very accurate hut which was read each month and it is his opinion that the distribution of the total Power Company^ bill was made in a very arbitrary sort of manner, and that the Water Company was consistently undercharged. He seems of the opinion if the Railroad Company wanted to go to the trouble to do so they could use the present meter readings and claim a considerable undercharge against the Water Company for the past several years. Mr. Cotmler says that the charge for energy furnished Booster Pump is the booster ptssp on coach hydrant line at depot and has nothing to do with water producing faeilties. Only well circuits #1 and #2 supply electric energy for water well facilities. 1. E. Maag