Search the Special Collections and Archives Portal

upr000280 125

Image
File
Download upr000280-125.tif (image/tiff; 26.62 MB)

Information

Digital ID
upr000280-125
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    J\Work Order Page No.___ 2. Number Description of Project Amount Total 4261 1 - Pump house 1 269.79 151 ft Fencing 777.06 1 - Pumping equipment 12 234.35 Poles and poxrer lines ? 1 794.07 976 ft - 14" Transite pipe 5 396.36 681 ft - 12” Cast iron pipe 5 273.56 10 669.92 27 745.19 4500 1534 ft - 12” Transite pipe 7 644.45 7 644.45 4712 5 ft - 12" Cast iron pipe 1 067,36 (Including valves and fittings) 36 ft - 8" Cast iron pipe 1 008.44 2 075.80 2 075.80 (Including valves and fittings) 4728 1 - Pump house 1 275.39 3 - Pumping equipment 11 597.52 Power lines 5 779.15 18 652.06 4789 2364 ft - 14” Transite pipe 13 827.03 45 ft - 14" Steel pipe 742.91 14 569,94 I36 ft - Fencing 665.02 1 - Pumping equipment 16 767.76 900 sq. ft - Roadway graveled 843.96 Power lines 1 450.42 34 297.10 TOTAL 531 5-46.22