Information
Digital ID
upr000287-083
Permalink
K5. Descrip oposed works. Water will be diverted bv a drilled well and distributed through a system of pumps, tanks and iron and/nr transit,e pipe lines 4. Estimated cost of works. 2. years 15. Estimated time required to construct the works is-- $ 10,000.------- Los Angeles and Salt Lake Railroad Company____ Applicant By- Z&vU/tdjLs CL OF STATE ENGINEER
