Information
Details
More Info
Transcription
\ T o ta l M r. R . L . Adamson, Sheet IIo. 1 6 .. 3.H. #9 - 75# S.R. frog S.H. 75# switch conplete 3.3* 75# guard r a ils S.H. 75# Tie Plates Walhaupter 3 .2 , 75# angle bars Hew 7/Qx4-1/4 track bolts Less cost at current prices o f parts replaced Hew #7-60# rig id frog Hew 60# switch complete S.H. 60# guard ra ils S.H. 75#-60# ^orop. Joints (2 jo in ts) S.H. 60# angle bars S.H. 60# Tie Plates Walhaupter Hew 3/4* track bolts Labor M atl • ea. 1 #43.31 ea. 1 33.56 cwt. 8.28 21.60 cwt • 2.45 1.94 cwt. 2.15 4.00 cwt. •26 1.57 ea. 1 27.16 OS< a 1 33.68 cwt. 6.44 21.60 cwt. 1.50 8.80 cwt. 2.94 3.60 cwt. 2.45 5.50 cwt • .22 1.33 $4.31 (10) Total ledger value o f portion o f track #29 necessary fo r unloading fu el o i l , $1,831.68 (10) Loooaotive Stand Pipe frines Station print shows locomotive standpipes located as follow s; 2 - 12" on main track near passenger depot 1 - 12" on eastbound turntable track 1 - 10** (?) on main track, Eng. Sta. 6504+14.4 2 - 4 " on yard track #39 Work Order 4249, completed September 29. 1925 Construct two new 12M water stand pipes at depot and one new 10" water stand pipe on east turntable track, 2236* o f 12" cast iron pipe connecting lin e to stand p ip es, from present water tank, and 750* o f 4M W .I. drain line #7 - 10" "S" standpipe couplets with column, valve and a ll necessary fit t in g s , ea. 1 $153.45 $555.08 Concrete foundation and n it Excavation - common c «y. 23 A 37.17 1.12 Plain ooncrete c *y • 24 *9 161.48 134.01 Interest during construction 9.11 HOTS: The above #7 - 10** standpipe was replaced under operating expenses - Letter Authority #L.A. #17 - with a #12 - 10" standpipe. The cost o f replacement is not o f record in th is o ff ic e but is available in the D ivision Accounting Bureau. #12 - 12" "S" standpipe complete with column, valve and a ll necessary fittin g s Ooncrete foundation and n it ea. 1 153.45 794.81 Excavation - common 0 • 23 *3 37.18 1.12
