Archival objects in this container: Arch construction for the Mike O'Callaghan-Pat Tillman Memorial Bridge and the bridge's deck at the Nevada border, 2009 July 01 Heliostats at northern boundary of Unit 3, 2013 September 05 Aerial view of construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge, Nevada-Arizona border, 2009 July 01 Unit 1 power block and solar field, 2013 November 01 Ironworkers preparing formwork for pouring concrete during construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge, Nevada border, 2009 July 01 View north of Units 1, 2, and 3 at dusk, 2013 November 01 Ironworkers preparing formwork for pouring concrete during construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge, Nevada border, 2009 July 01 Overview of Ivanpah Solar looking to the northwest at sunrise, 2014 February 03 Ironworkers preparing formwork for pouring concrete during construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge, Nevada border, 2009 July 01 Overview of Ivanpah Solar looking to the northeast at sunrise with Primm Valley Golf Course and Primm, Nevada in the background, 2014 February 03 Construction of the bridge deck on the Nevada side of the Mike O'Callaghan-Pat Tillman Memorial Bridge, 2009 July 01 Overview of Ivanpah Solar looking to the southeast, 2014 February 03 Construction of the bridge deck on the Nevada side of the Mike O'Callaghan-Pat Tillman Memorial Bridge, 2009 July 01 Power production, Unit 1, electrical power is being delivered to the grid, 2014 February 03 Aerial view of construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge as seen from temporary pylons on the Arizona side of the bridge, 2009 July 01 Power production, Unit 1, electrical power is being delivered to the grid, 2014 February 03 Aerial view of construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge as seen from temporary pylons on the Arizona side of the bridge, 2009 July 01 Power production at Unit 2 with Primm, Nevada in the background, 2014 February 03 Aerial view of construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge as seen from temporary pylons on the Arizona side of the bridge, 2009 July 01 All three units of Ivanpah Solar producing concentrated solar power, view to the east, 2014 February 03 Mike O'Callaghan-Pat Tillman Memorial Bridge being constructed over the Colorado River just before dawn, before dawn, 2009 July 02 View down on heliostats, heliostats are facing up are out of commission or in need of calibration, 2014 February 03 New transmission line construction parallels existing transmission lines across dry lake bed, 2014 February 03 Small temporary bridge built in the gap between the Arizona and Nevada sections of the Mike O'Callaghan-Pat Tillman Memorial Bridge, 2009 July 02 Highline crane system used to deliver materials for construction of the Mike O'Callaghan-Pat Tillman Memorial Bridge between Nevada and Arizona, 2009 July 02 Load More