p.23 #1725 Close-up of upper portal of Diversion Tunnels No. 3 & 4, during preparations for blast. Nov. 13, 1932. p.23 #1728 Close-up of upper portals of Diversion Tunnels No. 3 and 4, showing flow in diversion tunnel No.4, shortly after blast. Nov. 13, 1932. p.23 #1733 Dumping materials at temporary pile bridge to complete diversion of Colorado River. Nov. 13, 1932. p.23 #1737 Upper portals of Diversion Tunnels No. 3 & 4, and temporary dyke, after diversion of Colorado River was completed. Nov. 26, 1932.
Pg.85 #3355 Looking downstream toward the Arizona Spillway, showing highway bridge and Arizona Highway. Jul. 25, 1935. Pg.85 #3381 Switchyard, Rigging Loft, and surround area. Jul. 26, 1935. Pg.85 #3379 Looking downstream toward No.1 raise and Nevada Spillway. Note drainage flume in foreground. Jul. 26, 1935. Pg.85 #3383 Looking into No.3 downstream plug, from the Nevada plug adit. Note forms for the first pour being built. Jul. 26, 1935.
Contact sheets with images of moving the Houssels House from original location, 1012 S. 6th St., Las Vegas, Nevada, to grounds of UNLV campus on Brussells. Site Name: Houssels House
Proof sheet showing images of Houssels House moving from original location, 1012 S. 6th St., Las Vegas, Nevada, to grounds of UNLV campus on Brussells. Site Name: Houssels House
Proof sheet of images depicting the Houssels House moving from original location, 1012 S. 6th St., Las Vegas, Nevada, to grounds of UNLV campus on Brussells. Site Name: Houssels House