Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 1281 - 1290 of 7525

Photograph of power plant, Hoover Dam, February 23, 1939

Date
1939-02-23
Description
Black and white image of John Chatfield Page, Senator Harold L. Ickes, Mrs. Ickes, and I. C. Harris, in the Nevada wing of the Hoover Dam power plant. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Photograph of mud deposit, Hoover Dam, March 14, 1939

Date
1939-03-14
Description
Black and white image of a mud deposit at Hoover Dam. This site can be seen at mile 257, and a member of the survey crew displays a representative sample of one of the mud cubes formed to show the depth of the crevices. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Photograph of motor transport, Boulder City, Nevada, April 12, 1934

Date
1934-04-12
Description
Black and white image of "Big Bertha," the Six Companies, Inc. motor transport used to haul workmen between Boulder City and Hoover Dam. This double-decker truck could haul 154 men. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Slide of an entrance sign, Boulder City, Nevada, May 8, 1932

Date
1932-05-08
Description
Black and white image of a man and a car near a Deputy United States Marshal sign at the entrance to the Boulder Canyon Project Federal Reservation in Nevada.

Image

Slide of a patient in a hospital ward, Boulder City, Nevada, December 1, 1931

Date
1931-12-01
Description
The black and white image of a patient in a ward of the Six Companies, Inc. hospital in Boulder City.

Image

Slide of cover wagons used during the construction phase of Hoover Dam, Boulder City, Nevada, January 7, 1932

Date
1932-01-07
Description
Black and white image of men standing next to"cover wagons" in Boulder City. Nine cover wagons, each having a capacity of 48 men, were used to transport workmen from Boulder City to Black Canyon for the construction of the Hoover Dam. These buses were canvas-covered with side curtains that could be raised during hot weather. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Slide of the barged used in construction phase of Hoover Dam, Colorado River, January 10, 1932

Date
1932-01-10
Description
Black and white image of a barge used to transfer trucks and heavy materials across the Colorado River during the construction phase of the Boulder Canyon Project, better known as Hoover Dam. This specific barge is equipped with a double drum hoist. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Slide of boats used in construction phase of Hoover Dam, January 10, 1932

Date
1932-01-10
Description
Black and white image of boats used to transport men, powder, and supplies up and down the Colorado River in Black Canyon during the construction phase of the Boulder Canyon Project, better known as Hoover Dam. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image

Slide of the construction phase of the Hoover Dam, October 25, 1930

Date
1930-10-25
Description
Black and white image of the construction phase of the Boulder Canyon Project, also known as Hoover Dam. This image features a horse team outfit at the Boulder City branch of the Los Angeles and Salt Lake Railroad.

Image

Slide of the construction of the Hoover Dam, February 13, 1932

Date
1932-02-13
Description
Black and white image of Ray Lyman Wilbur, Secretary of the Interior, at a ceremony which inaugurated construction on the Boulder City branch of the Los Angeles and Salt Lake Railroad, signaling the beginning of the Boulder Canyon Project, later known as Hoover Dam. From left to right, the men pictured include: Senator Key Pittman of Nevada; Governor Fred Balzar of Nevada; Carl Gray, President of Union Pacific Railroad system; Secretary Wilbur holding the Nevada silver spike; and Senator Tasker L. Oddie of Nevada. Note: Boulder Dam was officially renamed Hoover Dam in 1947.

Image