Information
Details
More Info
Transcription
TABLE NO. 15 INTAKE STRUCTURES ON LAKE HEAR - SOUTH SHORE \ TO BE CONSTRUCTED IN CREELS! AND HANSEN ESTIMATE i$so :m . TOTAL 1950 ~ 1^51 — w m — Cantilever Structure 250* long ? 3*0,000 ? 340,000 ? 3*0,000 ? 3*0,000 Pumping Equipment - 4-300 H.P. Units 10 MOD 136' TDH 9 $17,510.00 Valves, cheats, etc., inel. installation Valves, piping, etc., on structure 70.000 19.000 25.000 70.000 19.000 25.000 19.000 25.000 19.000 25.000 Intake Pipe Line 1900 ft. - 5*« x 5/16* steel line 9 $50.00 ft. 95,000 95,000 92,000 92,000 Controls, eto. 25,000 25,000 25,000 25,000 Contingencies Engineering - P l a n s * Inspection, eto. - 57*,000 11,000 50,000 57*,00© 11,000 50,000 571,000 11,000 50,000 571,000 1510,,000000 TOTAL TABLE 15 - ? 710,000 ? 710,000 - $709,000 ? 709,000 ESTIMATED COST OF CONSTRUCTION - EXCLUDING POWER TRANSMISSION LINES AND STATION EQUIPMENT ?3,1*1,000 ?*,001,000 ?7,1*2,000 POWER TRANSMISSION LINES AND STATION EQUIPMENT 1*1,000 223,000 371,000 • TOTAL ESTIMATED COST OF PROJECT ?3,219,000 ?*,22*,000 ?7,513,000 ?3,122,000 $*,219,000 ?7,*11,000 (*) NOTE: This cost evidently included in G r e e l e y a n d H a n s e n ’s estimate o f c o s t o f B o o s t e r Stations.
