1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 of B n cast iron water mains and 525 feet of 6" cast iron.water mains, in location described as follows: Commencing at a connection with existing 8 n water main in South-Fifteenth Street at the intersection of Sweeney Avenue, thence continuing southerly in Fifteenth Street with an S1’ water main approximately 250 feet to the intersection of Bracken Avenue; thence westerly in Bracken Avenue with a 6” cast iron water main approximately 525 feet to a connection with existing 611 main in said Bracken Avenue* The cost of constructing said water main is the agreed sum of #2,650.00, the expense of which shall be borne by the Subdivider. 2. Said water main shall be constructed of 6” and ${1 cast iron pipe and shall be in accordance with AWWA specifications. All joints shall be cement and all pipe shall be new B & S cast iron, equal to AWWA Class 150. All fittings shall be new, all bell cast iron equal to AWWA Class 150, and all valve boxes shall be of cast iron of appropriate size for each valve. Unless otherwise provided by the approval of a duly authorized representative of the Company, all pipes, valves and fittings shall be manufactured by Pacific States Cast Iron Pipe Company or Mueller Company. All pipe lines shall be chlorinated in accordance with AWWA specifications, shall tie. subject to the approval and acceptance of State and City Health Authorities, and shall be constructed at an elevation to be designated by a duly authorized representative of the Company, but in no event shall there be less then 3 6 ” of covering /over such water: mains. All workmanship, material and .the installation of' said water main shall be subject to the approval and A -92