Information
Details
More Info
Transcription
Estimate of cost of a five-room cottage at Las Tegas, levada. elevations similar to design I©. 2, drawing Ho. of 6” concrete blocks, and "Ready Rock” roofing. 15574; exterior walls Description Material Labor Total Excavation (House, fence posts, etc)9cy@$*40 3*60 3.60 Concrete foundation, 9 1/2 c.y. 8.00 33.25 42.75 76.00 Chimney on "brackets, 10 lin. ft. 1.20 7.50 4.50 12.00 Exterior walls, 6” cone, blocks,1056s.f. .195 71.28 134.64 205.92 Rough lumber, 4,350* B.M. 34.00 82.65 65.25 147.90 Flo oring 1,150 * B. M. 43.00 32.20 17.25 49.45 "Ready Rock” roofing, 14 squares 3.30 32.20 14.00 46.20 Finish lumber, 700* B.M. 55.00 28.00 10.50 38.50 Ceiling, 425* B.M. 45 .'00 12.75 6.37 19.12 Moulding, 350 lin. ft. .04 7.00 7.00 14.00 n 325 n « .015 2.44 2.43 4.87 Base, l”x8”, 325 lin. ft. .12 19.50 19.50 39.00 Windows&Frames,6 2Xts« 3*04*x4*6”xl 1/2”) ' ?- 3 S ” 2*6”3:3,0”xl l/2”)7.50 45.00 22.50 67.50 ” 12” 3*6”x4*6”xl 1/2” 8.50 6.00 2.50 8.50 Window screens for lower sash, 10 .60 4.50 1.50 6.00 Doors and frames (Interior), 10 7.00 47.50 22.50 70.00 ” « n (Front). 1 12.00 8.75 3.25 12.00 ” ” ” (Screen), 2 2.00 3.25 .75 4.00 Porch screen, 60 sq. ft. .05 1.80 1.20 3.00 Kitchen cupboard 17.50 7.50 25.00 Hardware 54.00 54.00 Plastering, 350 sq. yds. .25 29.75 57.75 87.50 Painting, 231 ” ” .20 18.48 27.72 46.20 Plumbing 110.00 35.00 145.00 Board fence (Side & rear) 1126* B.I [. 34.00 21.39 16.89 38.28 Iron fence (Front & side) 65 lin. ft* .35 16.25 6.50 22.75 Cement walk 24*x$T, 3” thick, 72 sq.ft. .10 2.16 5.04 7.20 Electric lights(Single drop Its.) 9 outlets 2.50 12.50 10.00 22.50 Electric lights(2 light fixtures) 1 outlet 5.00 4.50 • 50 5.00 Cast iron ventilator plates,6”xl2” 6 per doss.3.50 1.75 1#75 10^ supervision & contingencies 73.38 54.88 128.26 Total estimated cost less freight t >807 • 23 $603.77 $ 1411.00 Freight at commercial rate 190.00 190.00 Total estimated cost plus freight at commercial rates $997.23 $605.77 $1601.00 Los Angeles, Cal., July 1, 19 09.