Information
Details
More Info
Transcription
3 - Company to own said water main; 4 - Subdivider to furnisb Company easements where said water main is to be laid in other than dedicated streets and alleys; be, and the same is hereby, ratified, approved and confirmed. Following Authority for Expenditure Requests, approved by the President, were submitted for ratification: A. F. E. No. 19 (W. 0. #655), issued Nov. 14, 1950; Las Vegas, Nev.; construct 800 ft. of 10” cast iron water main in alley, Block 1, Beverly Green Tract from connection with 10” main in Oakey Street near Sixth Street; construct 120 ft. of 6” cast iron pipe lateral to serve fire hydrant. Total estimated expenditure, $4210, chargeable to Investment in Water System-Las Vegas, Nevada. W. 0. #656, issued Nov. 24, 1950; Las Vegas, Nev.; lay 430 lin, ft. of 6” cast iron water pipe, replacing 430 lin. ft. of 4” cast iron main in Blocks 22 and 23, Wardie Addition. -Total estimated expenditure, $1640. Cost at current prices of new parts of kind retired, chargeable to OE, $215; cost of labor and material chargeable to OE, $595; total chargeable to OE, $810; chargeable to Water Service-Las Vegas, Nev., $830. W. 0. #657, issued Nov. 24, 1950; Las Vegas, Nev.; retirement of 140» of 4” Cl pipe water line. Credit Water System-Las Vegas,,Nev., $48, chargeable Accrued Depreciation-Pipe Lines, Las Vegas, Nev., $28, Misc. Debits to P&L, $20. A. F. E. No® 20 (W.O. #658), issued December 12, 1950; Las Vegas, Nev.; construct 1102 ft. of 8” and 1956 ft. of 6” cast iron water pipe lines to serve Tract No. 1 Westleigh Addition south of Charleston Blvd. from connection with Railroad main at north line of Charleston Blvd. at Douglas Drive. Total estimated expenditure, $13,820, chargeable to Investment in Water System-Las Vegas, Nevada. Whereupon, on motion duly seconded, it was RESOLVED, that the action of President in approving the aforementioned A. F. E. Requests be, and the same is hereby, ratified, approved and confirmed. -6
