Information
More Info
Transcription
frre.. N-°-» Page 1| I6l97-3a 16197-4 16197-5 16197-6 3-18-13 3-18-15 3- 18-16 3-18-17 3-18-18 I~67 I-7U H-223 10-1U-53 Water Levels and Pressure Switches Revised to Provide 60 psi at Bonanza Village Pump House. 4—17—48 Profile of Water Line Serving Bonanza Village. 4—17—48 Plan of Pipe Line Serving Bonanza Village 4- 30-48 Tank Details for Pressure Tanks. 7-27-51 Diagram of Reservoir Capacities at Las Vegas. Drawings for 300,000 gal.elevated steel water tank, Chicago Bridge and Iron Company drawings numbered as follows: Design Sheets Nos. 2, 20, 21 Polio No. 2S5, 2S11, 9P137, 9P138-X, 9P150, 9P159, 9S6, 0-153, 0-177, 0-191, 0-208 Stress Biagram dated 8-ll|-52, Sheet S Stress Diagram dated 8-llj.-52 Sheet SI Foundation Plan dated 1-6-53, Dwg. F General Plan dated 8-22-52, Sheet 1 30" Dia. Top Column Section dated 8-25-52, Sheet 5 Index Nos. I ? 2 k , 9Ci*9, 9D23, 9M^2-B, 9M55, AlU-ifRg, A-25-8S1, A30-1R1, A30-2R1, A30-3.1 Rl-X, A30-I|R1, A30-6-R-2-X, A30-7R2-X. Gravity Water Supply. Present and proposed Intake to Pipelines at Spring. 12-1921 Profile and Location of 16" C.I.P. Aug. 1923 Pipe Line LV Springs to Las Vegas 5- 1-UU Topog. Map showing location of Wells and Water Lines. Four cloth tracings and one paper tracing showing water lines City of Las Vegas. Cloth tracing showing facilities in water field Las Vegas. 9—2—47 Water Distribution System Las Vegas. Date 1-112 Bonanza Village Subdivision.
