Los Angeles, July 19, 19*46 Mr. R. L. Adamson1 Following Is the estimated percent of completion as of July 20, 19*l6, fo r Las Vegas Water F a c ilitie s , W.O. 3130: Estimated Percent of Completion Est» % Complete Estimated % of Jul y 2 °, date of Job 1946 completion Item Job 1* Reservoir 25 60 15 Aug* 30th 2* 2*4-“ Pipe Line in o l. By-pass 55 100 55 Completed % Booster Pump House & equipment 5 10 5 Aug. 30th k. Fire Pump House & Fire Lines 1 20 0*2 Sept. 30th 5* Fence — Aug. 30th 6* Well No. 11 k 100 4 Completed 7* Settling Basin 2 100 2 H 3* Power Lines 3 9° 2 .7 Aug* 30th 9* Pipe Lines in fie ld , 5 60 3*1 l Wells 10 and excluding lin e to Well #3 11 connected Line to well 9 postponed 100 «*• 61% lu n til Deo. Item 1, Reservoir. About 90^ of the concrete work has been completed, one section or 25^ of the wall and about 20% of the flo o r slab Is s t i l l to be poured. Roof framing i s about 10% complete* Roof sheathing Just arrived in Las Vegas and w ill be available when framing is completed. No roof sheathing has been placed todate* Item 3, Booster Pump House. f a Concrete flo o r slab and pump base was poured yesterday, July 13, 19*4-6. No other work completed this date. Pumps are available a t Byron-Jackson but no word has yet been received from Byron-Jackson as to date when motors w ill be shipped by the manufacturers* Item *t-, Fire Pump House and Fire Lines. Fire lin es and hydrants have been in sta lle d .