LOS ANGELES AND SA LT LAKE RAILROAD GO Valuation of Collection and Transmission Facilities (as of December 31* 1950) Quantity <D mU o• ® Reproduction Cost ITEM Probable Total Lif $ tH •aH ©tto Remaining Life P* Q 1 iH -3 §(§ I New Less Depree,, Settling Basin No» 2 15 a~6" x 81}-6" Reinforced Concrete bottom, walls and roof, complete with spillway and flushing drain Excavation - rock 421 CY 50 6 44 2 $ 2,150 $ 1,892 Backfill 17 CY t? H If II 45 40 Concrete Walls, baffle and roof slab 64 CY it n n II 1,280 1,126 Floor slab 30 CY it it n tt 600 528 Fill under floor 31 CY Vf 11 it it 465 .409 Forms 4510 SF n it it 11 3,605 3,172 Reinforced steel 940Q? n ft it It 940 827 12” W.Io Pipe, perfe, installed 72 LF n rt n It 1,340 1,179 12” W.Io Pipe drain 104 LF n It n it 835 735 12" Valve, Flg’do 1 Ea it It IV It 350 308 12" Valve, BE 1 Ea n 11 n It 264 232 Vents 2 E& it II it tl 90 79 Total For Settling Basin No0 2 % 11,964 I 10,527 =31'