Information
Details
More Info
Transcription
H COST ESTIMATE No. 2 Water Well - Las Vegas, Nev. MOD 20 Tons Rotary Mud, F.O.B. Car $230.00 10 Sacks Aquagel, F.O.B. Car 15*50 20 Sacks Baroid, F.O.B. Car 34.92 BITS 1 -1/2 Used Wright 20" Pilot # 76.44 1 -1/2 Used Hughes 15-1/8" Tricone 128.00 1 - New Hughes 9-3/4" Tricone 8 5.50 CASING 40* -16", 3/16 Plate Elec. Weld Pipe at 1.86 f 74*40 6* -21-1/2", 3/16 Plate Elec. Weld Pipe 15*94 550’ -10-3/4" 40.50# Csg. H-40 or Lapweld at 1.53 841.50 327* -7" 20# Csg. H-40 at 1.00 327.00 CASING PERFORATING 30 7* -7" 20# Csg., 100 Mesh, 12 Rows, 6" Centers, 2" Slot, at 44£ per foot CASING SHOES AND ADAPTERS 1 - IO-3/4", 32.75# Baker Whirl Float Shoe $ 85*50 1 - 7", 20# Bakhlu Bull Plug 23.02 1 - 10-3/4" 32.75# Baash-Ross Adapter 73*48 1 - Set 10-3/4" Csg. Clamps 25.00 $ 280.42 289*94 1,258.84 1 3 5 .0 8 207*00 CEMENT AND CEMENTING 1 - Cement Job 400 - Sacks Cement 1190.00 240*00 430.00 FOUNDATION 60.00 CHRISTMAS TREE FITTINGS 1 - 10-3/4" Close Nipple 1 - 10-3/4" Planted Cross 1 - IO-3/4" Bull Plug - Drilled for Gauge 2 - Merco Plug Cocks (flanged) RIG RENTAL 225 - Hours at $11.40 per Hour 48 - Hours at $8.00 per Hour 175*00 $2,565*00 384.00 2,949.00 MOVING, RIGGING UP, UNRIGGING, ETC. 3,200.00 TOTAL $8 , 985.28
