Information
Details
More Info
Transcription
J. M. MONTGOMERY & CO., INC, Engineers Los Angeles 35, Calif0 LOS ANGELES AND SALT LAKE RAILROAD CO. Valuation of Collection and Transmission Facilities (as of Dec. 31, 1950) ITEM Quantity Aver. Estimated Reproduction Cost Depreciation Age (Years) Total Life (Years) Per Unit Installed Overhead Amount Total Per Unit Total Amount Annual Accrued Present Value RESERVOIR NO, 1 * 2.5 M G Reservoir -(Clark St.) 21.5 50 115,684.00 5 5,784.20 121,468.20 121,468. 2,429.36 52,231. 69,237. Booster Pump Station: Structure 6.5 AO 5,442.00 5 272.10 5,714.10 5,714. 142.85 928, 4,786*. Pumps, etc. 6.5 30 11,650.00 5 582.50 12,232.50 12,232. %407.75 2,650. 9,582. Pipe, Valves, etc. 6.5 50 21,763.00 5 1,088.15 22,851.00 22.851. 457.02 ...iilTlt 19.880, $ 162,265. $ 58,780. $ 103,485. RJJS1JRV0£R NO, 3 1,2 M G Reservoir (Charleston Blvd.) 3.5 60 74,060.00 5 3,703.00 77,763.00 77,763. 1,296.05 4,536. 73,227. Drain Ditch lin. ft. 2,780 3.5 50 0.20 - 0,20 556. 11.12 39. 517. Fire Protection 3.5 40 3,769.00 5 188.45 3,957.45 3,957. 98.94 346. 3,611. Booster Pump Station: Structure 3.5 60 9,694.00 5 484.70 10,178.70 10,179. 169.64 594. 9,585. Pumps, etc. 3.5 30 16,972.00 5 848.60 17,820.60 17,821. 594.02 2,079. 15,742 Piping, Valves, etc0 3.5 50 13,437.00 5 671.85 14,108.35 14.109. 282.18 988. $ 124,385. $ 8,582. $ 115,803. SETTLING BASINS No. 1 25.5 50 7,199.00 5 359.95 7,558.95 7,559. 151.18, 3,855* 3,704.' No. 2 6.5 50 8,420.00 5 421.00 8,841.00 8 , 8 a . 176.82 1,149. 7,692. No. 3 3.5 50 7,195.00 5 359.75 7,554.75 7.555. 151.09 .. ....2,026, $ 23,9550 $ 5,533. * 18,422. BONANZA VILLAGE BOOSTER STATION Structure 1 .T 60 3,680.00 5 184.00 3,864.00 3,864. 64.40 97. 3,767. Pumps and Controls 1.5 30 8,530.00 5 426.50 8,956.50 8,957. 298.55 448. 8,509* Pipe and Fittings 1.5 50 5,209.00 5 260.45 5,469.45 - 5.469. 109.39 164, $ 18,290. $ 709. $ 17,581. - 6 -
