Information
Details
More Info
Transcription
Item ( 1) U n i t ( 2 ) Ho. o f U n i t s ( 3 ) Yr.Constricted (4) Valves - Coat ’A. $6** Vab lve, I»E S|a 14 11993*94 gj>« n • ft 6 1947 2* Check Valve • 1 I9A7 C.I. Valve Boxes « 15____ mm Total fcr Valves 60 1939*5 Pressure reducing setup complete with valves, fitting*,, pipe and concrete valve hex inel. 1-12* and 1- 6* pressure reducing valves, as per Bwg. 16180 dated Bov. 20, 1947 Ea | 19*7 Total Pressure Bedueiag Valves Misc. Eire Hydrants. Etc. 4* Tire Hydrant* Ea 10 - Hose Reel Boxes ? 10 ea 2|* CBL Eire Bose IF 700 mm Hose Bossies Ea 10 mm Hose Keels m 10 — Misc. Cone. Boxes, etc. CY 91.1 1935 Excavation « 97 **** Lumber MBM 0.39© mm Hhahole frame ft cover Ba 1 1927 Total for Misc. lire Hfd. Etc. Remove and Replace pavements and support Kfi tracks at pipe crossings I*ot Total ~ Average Age (Yrs.)__ (5) 3 15 Office of Vice President, Los Angeles, California March 23, 1951 Cost o f R e p r o d u c tio n 30 1st. Unit Hew Life Cond. Price Less (Yrs.) i $ Hew Depreciation (6) (7) (8) (9) (10) # # 67.00 67 A0.00 160 M oo 240 11.00 11 20.00 300 77.i¥ #35,485 #27,373 50 94 5,982.00 5.983 j u&a I 5.982 #5,623 8II0 14285..0000 1,245800 1,128040 * 1.55 1,085 868 B 7.5© 75 60 » 13.00 130 1104 5«© 7*© 202..5000 1,822423 1,217760 8«0 15650.00 60 48 .oo 60 m #5.205 #3.958 77.1* #20.445 #15.771 #1,472,409 #1,127,008
