Information
Details
More Info
Transcription
J. M. MONTGOMERY & CO., INC Engineers Los Angeles, Calif. LOS ANGELES & SALT LAKE RAILROAD CO. Continued Collection and Transmission Facilities (as of Dec • 31,1950) ITEM Quantity Aver. Estimated Reproduction Cost Age Total Life Decree iati or Per Unit Overhead Total Total PrAflAnt (Yrs.) (Yrs.) (Installed' Amount Per Unit Amount Anmifil INDUSTRIAL PIPE LINE Pipe: Value A" Cast Iron l.f. 2A0 5.5 AO 1.80 5 .09~ 1.89 A5A.00 11.3A 62.00 392.00 6" Cast Iron l.f. 3276 16.5 50 2.56 5 .13 2.69 8,812.00 176.25 2,908.00 5,90A,00 Valvesj 6" Gate Valves ea. 5 15.5 35 93.50 5 A.67 98.17 A91.00 1A.02 217.00 27A.00 A" Gate Valves ea. 6 6.5 25 61.73 5 3.09 6A.82 389.00 15.56 101.00 288.00 Fire I^rdrants - A" ea. A 5.5 AO 132.00 5 6,60 138.60 55A.OO 13.86 76.00 A78.00 Meter - Pacific Fruit Express: A" Flanged Trident Compound 1 6.5 25 573.19 5 28.66 601.85 602.00 2A.07 156.00 AA6.00 Meter Box Complete 1 6.5 50 260.00 5 13.00 273.00 273.00 5.A6 35.00 238.00 Pipe & Fittings) As Installed all 23.5 AO A30.00 5 21.50 A51.50 A51.00 11.29 265.00 186.00 $12,026.00 $3,820.00 $8,206,00 MAINTAINER'S BUILDING Shanty 10.5 30 280.00 5 1A.00 29A.O0 29A.00 9.80 103.00 191.00 Dwelling "5.5 30 6,881.00 5 3AA.05 7,225.05 7,225.00 2A0.8A 1,325.00 5,900.00 $7,519.00 $1,A28.00 $6,091.00 FENCING At Reservoir No. 1 l.s. (930 * / gate) (382* / : gate) (97A» / 3 gates) 21.5 AO 3,075.00 5 153.75 3,228.75 3,229.00 80.72 1,735.00 1,A9A.00 Settling Basin No. 1 1 • s • 21.5 AO 1,265.00 5 63.25 1,328.25 1,328.00 33.21 71A.00 61A.00 Reservoir No, 2 X • 8 • 3.5 AO 3,775.00 5 188.75 3,963.75 3,96A.00 99.09 3A7.00 3,617.00 Continued 13 -
